Quote Originally Posted by Mumps View Post
Well, my 460GT is doing the Longs in roughly 42 hours, and the shorts in roughly 9:15. So guess which one I've been running..
I'll measure the time, and probably hit this challenge with a whopping 2 or 3 cards. I'll get a long work unit done by the end of the first day, *maybe* a second one during the project, then switch to all short to get the max points during the project time frame.