LAF: What is the percentage of progress of different projects, how many years expected ?
yoyo:
- The OGR project (with different ruler length) is running since 2007. Currently we run the 27 rulers. Yoyo@home provides ~ 20% of the OGR computing power. The project will finish in ~ 1 year.
- Evolution@home doesn't really have an end. It is a simulation of mutations. The goal is to get as much as possible simulations. I think yoyo@home provides more than 90% of this project.
- Muon will finish probably in 2015. I assume yoyo@home contributes 30% of this project.
- ECM, there will be forever the need of integer factorization. So this project might run forever. yoyo@home contributes up to 70% to the ecm effort of the various subprojects.
- The Euler project was already finished. It was nearly 100% done on yoyo@home. We verified all already found solutions and found a lot more. The results were published for open access.
- HarmoniousTree will finish in the next days. It was entirely done in yoyo@home. Afterwards we will not start the next node level, we will first consolidate the results in a scientific paper.